Case Studies

Case Study 01/2016

Client name: Mitterfirmiansreut municipality.
Country: Bavaria, Germany.
Location: Granite, Hill.

Background: In the previous company, the client had 4 empty water wells up to 118 meters deep at the top of the mountain. The forecasts of the remaining drilling companies were negative, and the client was getting ready to end the extraction of water.

Result: Our team found a water source at a depth of 22 meters, 47 meters from the previous empty well. This ensured a constant supply of water with a volume of 200 cubic meters per day.

Case Study 02/2017

Client name: Perlesroit municipal.
Country: Bavaria, Germany.
Location: Granite, Hill.

Background: The client had an empty water well, 67 meters deep, and was considering completing the water production due to the negative outlook of the previous mining company.

Result: Our team found a water source at a depth of 17 meters, 25 meters from the previous empty well. Water supply - 175 cubic meters per day.

Case Study 03/2019

Client name: Municipality of Ulrichstein.
Country: Germany.
Conditions: Basaltic Hills.
Industry: Public Water Supply.

Background: All the drillings so far have been unsuccessful. The forecasts of the geologists companies were negative, connection to the central water supply was recommended - a long and costly project.

Result: Our team discovered a water source at the top of the hill at the water collector site 15 meters from the water connection point. Borehole depth approximately 200 meters, final water level of the source 87 meters. The demand was 260 cubic meters per day. Right now the capacity is over 300 cubic meters per day.

Case Study 04/2020

Client name: Farmer.
Country: South Africa.
Conditions: Dolomites.
Industry: Agriculture

Background: Geologists and local drillers have concluded that the water found here is mostly salty, and that you cannot find unsalted water by drilling. Farm 1 - Three previous drilling attempts have resulted in two dry boreholes and one very salt water well. Farm 2 - three previous drilling attempts resulted in three dry boreholes.

Result: Our team discovered a water source at Farm 1, the first water appeared at a depth of 14 meters, the final water capacity of the water source is 86 cubic meters per day fresh water. At Farm 2 a water source was discovered at a depth of 97 meters. The capacity of the water source is 260 cubic meters per day - the water is non-salty.

Case Study 05/2020

Client name: Farmer.
Country: Germany, Altmanstein City.
Conditions: Jurassic limestones
Industry: Agriculture

Background: Earlier forecasts indicated that the conditions would not allow the discovery of water sources, especially those of high capacity. The demand was to have a water source with a capacity of 10 liters per second. Previous drilling tests were performed at a depth of 80 meters with a water output of 2 liters per second.

Result: Our team discovered a water source at a depth of 88 meters. The water level at the source is 56 meters, the efficiency is 10 liters per second respectively 865 cubic metres per day.

You want to know more about our services?

Then feel free to contact us via our inquiry form on our homepage.